Clause 60: NEC Compensation Event Software
Our NEC compensation event review software. Built on 20+ years of NEC experience, it reads the CE pack, contract and programme and returns an evidence-grounded review in minutes.
What is Clause 60?
Our consultancy experience, built into software
Assessing an NEC compensation event properly is slow, detailed work. Someone experienced has to read the whole pack, follow the cost build-up line by line, check it against the contract and the Schedule of Cost Components, and test whether the claimed time impact really holds up against the programme. It is done under deadline pressure, event after event, and a missed point is money lost.
Clause 60 was founded by Sheldon Wright MCICES, the director of Wright Commercial Consultants, to make that work fast, consistent and repeatable. It produces a structured, section-by-section first-pass review of each event, covering contractual basis, cost, time and programme, and risk, which you check and put your name to. Every finding is cited to your documents, and anything missing is flagged rather than assumed.
Why use Clause 60?
Faster, more rigorous CE assessments on both sides of the contract
Minutes, not hours. Upload the quotation, contract documents and programme, and a first-pass review is typically back in about ten minutes. Run several events at once.
Built for NEC3 and NEC4. ECC and subcontracts, Options A to E, with awareness of Z-clauses and amended contracts.
Side-neutral. Main contractors, subcontractors and client or PM teams get the same evidence-based review, so it holds up when the other side pushes back.
Secure by design. UK data residency, mandatory MFA, CREST penetration tested and Cyber Essentials certified. Your data never trains AI.
Priced per project, not per seat. Start with a 30-day pilot on your own live events, credited in full against your first year.

For Main Contractors
Assess incoming subcontract quotations faster, and raise the quality of the ones going up to the Client, with every rate checked against the contract.
For Subcontractors
Find the holes in your quotation before the main contractor does, and check their assessment when it cuts you.


Book a Free Demo
Want to see Clause 60 on your own compensation events, or talk through NEC commercial support? Send us a message below and we will arrange a free, no-obligation walkthrough.
For Clients & PM Teams
Every compensation event assessed properly and inside the reply period, across every project on the framework.